Natural gas transmission
BRUA / Lot 2
Welding and lowering a transmission pipeline
Participation in BRUA is one of the named references in the Steel Pipe Weld portfolio. In collaboration with Inspet Ploiești S.A., the company carried out welding work and participated in lowering approximately 1,700 metres of pipeline within section 65.
The work belongs to Lot 2, from kilometre 180 to kilometre 320, in the project's first phase. The presentation records 170 welds on 32-inch carbon-steel pipe. SPW's stated scope covers welding and participation in lowering within the identified section.
- recorded welds
- 170
- pipe diameter
- 32″
- participation section
- 1,700 m
Figures from the SPW presentation. The described contribution concerns the specified section, not delivery of the entire BRUA project.